
Add to Cart
Seamless Stainless Steel Tp410 Boiler U Bend Heat Exchanger Tubing/ Pipe Factory Best Selling
U Bend Tube are manufactured in our plant as per the customer requirements. Solution annealing after bend will
be process to lower the risidual stress, and followed by hydrostatic testing and dye penetrant testing if required.
U Bend Tube are widely used in heat-exchanger systems. Heat exchanger equipment on the basis of stainless
steel U-tube is essential in strategically important and critical fields nuclear and petrochemical machine building.
Brand Name | TOBO |
Product Name | U Type Boiler Tube |
Certification | BV/ABS/LR/TUV/DNV/BIS/PED |
Place of Origin | Shanghai China (Mainland) |
Thickness | SCH10S,SCH40S,SCH80S,SCH160S (1mm~60mm), or as cutomers' need |
Outer Diameter | 1/8"~32" (6mm~830mm),or as customers' requirements. |
Length | 30 m(Max) or as your requirement |
Process | Cold drawn, Cold rolled, Hot Rolled, Hot bend |
Surface treatment | Polishing,annealing,bright annealing and acid pickling |
Finish | Oil-dip, Varnish, Passivation, Phosphating, Shot Blasting or as requested |
Ends | Beveled or plain end, square cut, burr free ,Plastic Cap at Both end |
Material | TP304,TP304L,TP304H,TP316,TP316L,TP316Ti,TP309,TP310S,TP314, |
TP317L,TP321,TP347H,904L,S31803,S32205,S32750 etc. | |
Standard | ASTM A213,ASTM A269,ASTM A270,EN10216-5,ASTM B622,ASTM B516,ASTM A789,ETC. |
Application | Petroleum/Power/Chemical/Construction/GaS/Metallurgy/Shipbuilding etc |
Minimum Order Quantity | 1pcs |
Price | Depending on quantity |
Payment Terms | T/T or Western Union or LC |
Supply Ability | 3,0000pcs per month |
Delivery Time | 10-50 days depending on quantity |
Packaging Details | PLY-WOODEN CASE OR PALLET |
Product Advantage | (1)professional manufacturing (2)Good quality control system and service system (3)Full experienced in export business in steel pipes (4)Convenient location for transport (5)Flexible payment (6)Huge Supply Capacity Advantage, Timely and Effective Delivery (7)competitive price,best service,fast delivery (8)Big discount for repeat customers.
|
Packing and Shipping
Package:Standard export carton packing.
Delivery time:stock 7-10 workign days after confirming order,detail delivery date should be decided according to
production season and order quantity.
1) for R 100 mm +/- 3 mm
2) for R ≥ 100 mm +/- 5 mm
4). U bend Pipe Straightness tolerance max. 1,5 mm per 1 m
U Bend Tube ends: plain, vertically cut to the tube axis
U Bend Tube OD in mm can be bent upon agreement: 15.8 16.0 17.0 18.0 19.05 20.0 21.3 25.4 26.7 31.8 32.0 38.1mm
U bend Tube Initial Length
Maximum lengths of 27000mm can be supplied on request